Production
Planning
and
Control
4.7
March 2001September 2003
EnglishEnglish
Production Planning and Controlling (J06)
SAP AG
Neurottstr. 16
69190 Walldorf
Germany
Building Block Configuration Guide
SAP Best Practices Production Planning (J06): Configuration Guide
Copyright
© Copyright 2003 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without
the express permission of SAP AG. The information contained herein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.
Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks of Microsoft Corporation.
IBM®, DB2®, DB2 Universal Database, OS/2®, Parallel Sysplex®, MVS/ESA, AIX®, S/390®, AS/400®, OS/390®, OS/400®, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere®, Netfinity®, Tivoli®, Informix and Informix® Dynamic ServerTM are trademarks of IBM Corporation in USA and/or other countries.
ORACLE® is a registered trademark of ORACLE Corporation.
UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of the Open Group.
Citrix®, the Citrix logo, ICA®, Program Neighborhood®, MetaFrame®, WinFrame®, VideoFrame®, MultiWin® and other Citrix product names referenced herein are trademarks of Citrix Systems, Inc.
HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.
JAVA® is a registered trademark of Sun Microsystems, Inc.
JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.
MarketSet and Enterprise Buyer are jointly owned trademarks of SAP AG and Commerce One.
SAP, SAP Logo, R/2, R/3, mySAP, mySAP.com, xApps, mySAP Business Suite, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies.
Icons
Icon
Meaning
Caution
Example
Note or Tip
Recommendation
Syntax
Typographic Conventions
Type Style
Description
Example text
Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.
Cross-references to other documentation.
Example text
Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT
Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example text
Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.
EXAMPLE TEXT
Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.
Example text
Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
<Example text>
Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
Contents
J06 – Production Planning and Controlling: Configuration Guide 6
1 Purpose 6
2 Preparation 6
2.1 Prerequisites 6
2.2 Uploading the Configuration Role 6
3 Configuration 7
3.1 Sales and Operation Planning 7
3.1.1 Set Planning Plant for SOP 7
3.2 Material Requirements Planning 7
3.2.1 Define MRP Controller 7
3.2.2 Special Procurement Type 8
3.2.3 Planning Horizon for Plant 10
3.2.4 Carry Out Overall Maintenance of Plant Parameters 11
3.2.5 Carry Out Overall Maintenance of MRP Groups 17
3.2.6 Define Availability of Stock 18
3.2.7 Define Rescheduling Check 19
3.2.8 Define Error Processing in Planning Run 19
3.2.9 Define Range of Coverage 20
3.2.10 Storage Cost percentage / Check Lot Sizing Procedure 21
3.2.11 Define External Procurement 22
3.2.12 Define Line Item Number 23
3.2.13 Define BOM and Routing Selection 23
3.2.14 Conversion Planned Order-> Prod Order 24
3.2.15 Number of Planned Order 24
3.2.16 Item Number of Order Type 25
3.2.17 Activate MRP and Set Up Planning File 26
3.2.18 Define Receipt Elements for Receipt Days' Supply 26
3.2.19 Define Scheduling Parameters for Planned Orders 27
3.3 Shop Floor Control 28
3.3.1 Define Routing Selection ID 28
3.3.2 Define Standard Values Parameters 29
3.3.3 Define Standard Value key 31
3.3.4 Determine Person Responsible 32
3.3.5 Define Formulas for Work centers 33
3.3.6 Define Control Keys 35
3.3.7 Define Scheduling Margin Key 36
3.3.8 Define Reasons for Variances 36
J06 – Production Planning and Controlling: Configuration Guide
1 Purpose
The purpose of this document is to describe the general configuration steps required to manually set up the configuration within the system landscape that has already been installed using the corresponding installation or configuration guides for installation.
The Building Block Configuration Guide describes how to set up the configuration of a building block manually, without the support of automated configuration tools. If you want to use BC Sets, LSMW, ECATT and CATT procedures for an automated installation process, refer to the Building Block Installation Guide of this building block
2 Preparation
2.1 Prerequisites
List dependencies with other building blocks and describe the general prerequisites that you have to fulfill to install this building block. Do not repeat preparation settings already described in other building block guides.
2.2 Uploading the Configuration Role
Use
Before you start with the configuration according to the manual procedures described in this Configuration Guide, you can upload the configuration role and assign it to your user.
This building block provides a configuration role for each SAP component that is involved in its configuration, such as SAP APO; SAP R/3, or SAP CRM. The configuration role enables you to comfortably access all transactions required for the configuration from the relevant system. The following roles are available:
Technical name
Description
File name for upload
/SMB12/J06_01I
J06 Production Planning
_SMB12_J06_01I.SAP
Procedure
For details how to upload the configuration roles to the system and how to work with the roles please refer to the document Essential Information.
3 Configuration
3.1 Sales and Operation Planning
3.1.1 Set Planning Plant for SOP
Use
Procedure
1. To carry out the activity, choose one of the following navigation options:
SAP <System>
Role Menu
User menu à J06 Production Planning à Installation à /SMB12/S300_J06_01 - Sales & Operations Planning (SOP)
Transaction Code
SPRO
IMG Menu
Production à Sales & Operation Planning (SOP) à Master Data à Set Planning Plant for SOPà Maintain SOP Planning Plant
2. On the screen, choose the New Entries button.
3. Make the following entries:
Plnt
Plnt
BP01
X
BP02
X
BP03
X
BP0X
X
4. Choose Save.
5. Choose Back.
3.2 Material Requirements Planning
3.2.1 Define MRP Controller
Use
Procedure
1. To carry out the activity, choose one of the following navigation options:
SAP <System>
Role Menu
User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)
Transaction Code
SPRO
IMG Menu
Production à Material Requirements Planning à Master Data à Define MRP Controllers
2. On the Change View “MRP Controllers”: Overview screen, choose the New Entries button.
3. Make the following entries:
Plnt
MRPCn
Name 1
Name
BP01
工厂BP01
001
MRP控制者
BP01
工厂BP01
Y01
MRP控制者-成品
BP01
工厂BP01
Y02
MRP控制者-其他
BP02
工厂BP02
001
MRP控制者
BP02
工厂BP02
Y01
MRP控制者-成品
BP02
工厂BP02
Y02
MRP控制者-其他
BP03
工厂BP03
001
MRP控制者
BP03
工厂BP03
Y01
MRP控制者-成品
BP03
工厂BP03
Y02
MRP控制者-其他
BP0X
工厂BP0X
001
MRP控制者
BP0X
工厂BP0X
Y01
MRP控制者-成品
BP0X
工厂BP0X
Y02
MRP控制者-其他
4. Choose Save.
5. Choose Back.
3.2.2 Special Procurement Type
Use
Procedure
1. To carry out the activity, choose one of the following navigation options:
SAP <System>
Role Menu
User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)
Transaction Code
SPRO
IMG Menu
Production à Material Requirements Planning à Master Data à Define Special Procurement Type
2. On the screen, choose the New Entries button.
3. Make the following entries:
Plnt
SP type
Long Text EN
Long Text ZH
Proc type
Sp.proc.
Plnt
Direct productn
Phantom item
BP01
10
BP Consignment
BP 外部采购-寄售
F
2
BP01
20
BP External procurement
BP 外部采购
F
0
BP01
30
BP Subcontracting
BP 外部采购-分包
F
3
BP01
40
BP Stk transf (proc.fr alter.plant)
BP 库存转换(来自可选工厂的产品)
F
7
BP02
BP01
45
BP Stk transf fr plant to MRP area
BP 库存从工厂到 MRP 范围
F
7
BP02
BP01
50
BP Phantom assembly
BP 虚无装配
E
E
X
BP01
52
BP Direct prodn / collective order
BP 直接生产/收集订单
E
E
X
BP01
60
BP Phantom in planning
BP 虚拟计划
E
E
BP01
70
BP Withdrawal from alternative plant
BP 从替代工厂领料
E
E
BP01
80
BP Production in alternative plant
BP 在替代工厂生产
E
P
BP02
BP02
10
BP Consignment
BP 外部采购-寄售
F
2
BP02
20
BP External procurement
BP 外部采购
F
0
BP02
30
BP Subcontracting
BP 外部采购-分包
F
3
BP02
40
BP Stk transf (proc.fr alter.plant)
BP 库存转换(来自可选工厂的产品)
F
7
BP01
BP02
45
BP Stk transf fr plant to MRP area
BP 库存从工厂到 MRP 范围
F
7
BP01
BP02
50
BP Phantom assembly
BP 虚无装配
E
E
X
BP02
52
BP Direct prodn / collective order
BP 直接生产/收集订单
E
E
X
BP02
60
BP Phantom in planning
BP 虚拟计划
E
E
BP02
70
BP Withdrawal from alternative plant
BP 从替代工厂领料
E
E
BP02
80
BP Production in alternative plant
BP 在替代工厂生产
E
P
BP01
BP03
10
BP Consignment
BP 外部采购-寄售
F
2
BP03
20
BP External procurement
BP 外部采购
F
0
BP03
30
BP Subcontracting
BP 外部采购-分包
F
3
BP03
40
BP Stk transf (proc.fr alter.plant)
BP 库存转换(来自可选工厂的产品)
F
7
BP01
BP03
45
BP Stk transf fr plant to MRP area
BP 库存从工厂到 MRP 范围
F
7
BP01
BP03
50
BP Phantom assembly
BP 虚无装配
E
E
X
BP03
52
BP Direct prodn / collective order
BP 直接生产/收集订单
E
E
X
BP03
60
BP Phantom in planning
BP 虚拟计划
E
E
BP03
70
BP Withdrawal from alternative plant
BP 从替代工厂领料
E
E
BP03
80
BP Production in alternative plant
BP 在替代工厂生产
E
P
BP01
4. Choose Save.
5. Choose Back.
3.2.3 Planning Horizon for Plant
Use
Procedure
1. To carry out the activity, choose one of the following navigation options:
SAP <System>
Role Menu
User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)
Transaction Code
OMDX
IMG Menu
Production à Material Requirements Planning à Planning à MRP Calculation à Define Planning Horizon à Plant
2. On the screen, choose the New Entries button.
3. Make the following entries:
Plnt
PlHor
BP01
100
BP02
100
BP03
100
BP0X
100
4. Choose Save.
5. Choose Back.
3.2.4 Carry Out Overall Maintenance of Plant Parameters
Use
Procedure
1. To carry out the activity, choose one of the following navigation options:
SAP <System>
Role Menu
User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)
Transaction Code
OPPQ
IMG Menu
Production à Material Requirements Planning à Plant Parameters à Carry Out Overall Maintenance of Plant Parameters à Maintain
2. On the screen, choose the New Entries button.
3. Make the following entries:
Plnt
MRPCn
Name
BP01
001
Disponent
BP02
001
Disponent
BP03
001
Disponent
4. Choose Save.
5. On the screen, choose the New Entries button.
6. Make the following entries:
Plnt
FrmPO
Fm.PR
OrdIt
Resch
Tval.
TolVa
PlHor
NR
NR
ItPRq
NR
NR
ISTRe
BP01
X
X
X
100
02
02
100
01
01
00010
01
01
0100
BP02
X
X
X
100
02
02
100
01
01
00010
01
01
0100
BP03
X
X
X
100
02
02
100
01
01
00010
01
01
0100
Purchasing proc.time
SMRPG
MPOP
PlOrd
Fr.
SelID
D
W
M
P
00
001
050
500
001
01
X
X
X
00
001
050
500
001
01
X
X
X
00
001
050
500
001
01
X
X
X
PrOrd
SOb
DPr
C
*
A
M
T
QMInL
B
A
X
X
3
E
U
U
X
X
X
X
D
X
X
3
E
U
U
X
X
X
X
D
X
X
3
E
U
U
X
X
X
X
D
ChR
Type
SNot.
ChR
L
P
S
Q
PP
YB03
X
BO
X
X
X
PP
YB03
X
BO
X
X
X
PP
YB03
X
BO
X
X
X
P
P
R
NR
OTyp
Simulative planned orders
X
X
X
01
YB02
01
X
X
X
01
YB02
01
X
X
X
01
YB02
01
Promotion period
No.rangeTot. reqs
Include restricted-use stock
000
01
X
000
01
X
000
01
X
APOrd
SN
X
X
X
X
X
X
7. Choose Save.
8. On the screen, choose the New Entries button.
9. Make the following entries:
Plnt
SMKey
Op.Pd
Float after pro.
FloatBefProd.
Release period
BP01
000
000
000
000
000
BP01
001
010
001
002
005
BP02
000
000
000
000
000
BP02
001
010
001
002
005
BP03
000
000
000
000
000
10. Choose Save.
11. On the screen, choose the New Entries button.
12. Make the following entries:
Plnt
SPT
R
Sp.proc.
Plnt
Direct productn
Phantom item
BP01
10
F
2
BP01
20
F
0
BP01
30
F
3
BP01
40
F
7
BP01
45
F
7
BP01
BP01
50
E
E
X
BP01
52
E
E
X
BP01
60
E
E
BP01
70
E
E
BP01
80
E
P
BP02
10
F
2
BP02
20
F
0
BP02
30
F
3
BP02
40
F
7
BP02
45
F
7
BP02
BP02
50
E
E
X
BP02
52
E
E
X
BP02
60
E
E
BP02
70
E
E
BP02
80
E
P
BP03
10
F
2
BP03
20
F
0
BP03
30
F
3
BP03
40
F
7
BP03
45
F
7
BP03
BP03
50
E
E
X
BP03
52
E
E
X
BP03
60
E
E
BP03
70
E
E
13. Choose Save.
14. On the screen, choose the New Entries button.
15. Make the following entries:
Plnt
SPT
Long Text
BP01
10
Consignment
BP01
20
External procurement
BP01
30
Subcontracting
BP01
40
Stock transfer (proc.from alter.plant)
BP01
45
Stock transfer from plant to MRP area
BP01
50
Phantom assembly
BP01
52
Direct production / collective order
BP01
60
Phantom in planning
BP01
70
Withdrawal from alternative plant
BP01
80
Production in alternative plant
BP02
10
Consignment
BP02
20
External procurement
BP02
30