温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
IEC_62561
_Ed
_1
FORM CDV(IEC)2009-01-09 Registered trademark of the International Electrotechnical Commission 81/385/CDVCOMMITTEE DRAFT FOR VOTE(CDV)PROJET DE COMIT POUR VOTE(CDV)Project number 62561-1 Ed.1.0 Numro de projet IEC/TC or SC:81 CEI/CE ou SC:Secretariat/Secrtariat Italy Submitted for parallel voting in CENELEC Soumis au vote parallle au CENELEC Date of circulation Date de diffusion 2010-12-03 Closing date for voting(Voting mandatory for P-members)Date de clture du vote(Vote obligatoire pour les membres(P)2011-05-06 Also of interest to the following committees Intresse galement les comits suivants SC 37A,TC 64,TC 77 Supersedes document Remplace le document 81/339/CD 81/346/CC Proposed horizontal standard Norme horizontale suggre Other TC/SCs are requested to indicate their interest,if any,in this CDV to the TC/SC secretary Les autres CE/SC sont requis dindiquer leur intrt,si ncessaire,dans ce CDV lintention du secrtaire du CE/SC Functions concerned Fonctions concernes Safety Scurit EMC CEM Environment Environnement Quality assurance Assurance qualit CE DOCUMENT EST TOUJOURS LTUDE ET SUSCEPTIBLE DE MODIFICATION.IL NE PEUT SERVIR DE RFRENCE.LES RCIPIENDAIRES DU PRSENT DOCUMENT SONT INVITS PRSENTER,AVEC LEURS OBSERVATIONS,LA NOTIFICATION DES DROITS DE PROPRIT DONT ILS AURAIENT VENTUELLEMENT CONNAISSANCE ET FOURNIR UNE DOCUMENTATION EXPLICATIVE.THIS DOCUMENT IS STILL UNDER STUDY AND SUBJECT TO CHANGE.IT SHOULD NOT BE USED FOR REFERENCE PURPOSES.RECIPIENTS OF THIS DOCUMENT ARE INVITED TO SUBMIT,WITH THEIR COMMENTS,NOTIFICATION OF ANY RELEVANT PATENT RIGHTS OF WHICH THEY ARE AWARE AND TO PROVIDE SUPPORTING DOCUMENTATION.Titre:Title:Lightning Protection System Components(LPSC)-Part 1:Requirements for connection components Note dintroduction Introductory note ATTENTION VOTE PARALLLE CEI CENELEC Lattention des Comits nationaux de la CEI,membres du CENELEC,est attire sur le fait que ce projet de comit pour vote(CDV)de Norme internationale est soumis au vote parallle.Les membres du CENELEC sont invits voter via le systme de vote en ligne du CENELEC.ATTENTION IEC CENELEC PARALLEL VOTING The attention of IEC National Committees,members of CENELEC,is drawn to the fact that this Committee Draft for Vote(CDV)for an International Standard is submitted for parallel voting.The CENELEC members are invited to vote through the CENELEC online voting system.Copyright 2010 International Electrotechnical Commission,IEC.All rights reserved.It is permitted to download this electronic file,to make a copy and to print out the content for the sole purpose of preparing National Committee positions.You may not copy or mirror the file or printed version of the document,or any part of it,for any other purpose without permission in writing from IEC.62561-1 IEC:2010 2 81/385/CDV IEC 62561-1:Lightning Protection System Components(LPSC)Part 1:Requirements for connection components (The content of this document is taken from the European Standard EN 50164-1)62561-1 IEC:2010 3 81/385/CDV CONTENTS 1 Scope.5 2 Normative references.5 3 Terms and definitions.5 4 Classification.6 5 Requirements.7 5.1 General.7 5.2 Installation instructions.7 5.3 Lightning current carrying capability.7 5.4 Static stress.7 5.5 Screwed clamping connection.7 5.6 Dismantling of test joints.7 5.7 Damage to conductors and metal installations.7 5.8 Safe connection.8 5.9 Terminals of bonding bars.8 5.10 Marking.8 6 Tests.8 6.1 General condition on tests.8 6.2 Test preparation.9 6.3 Electrical test.9 6.4 Static mechanical tests.10 6.5 Marking test.10 7 Electromagnetic compatibility(EMC).10 8 Structure and content of the test report.11 Annex A(informative)Summary of the requirements and corresponding tests 18 Annex B(informative)19 Annex C(normative)19 Figure 1 Basic arrangement of specimen with cross connection component 13 Figure 2 Basic arrangement of specimen with parallel connection component 14 Figure 3 Basic arrangement of specimen with bridging component 15 Figure 4 Basic arrangement of specimen with equipotential bonding bar 16 62561-1 IEC:2010 4 81/385/CDV INTRODUCTION This part of IEC 62561 deals with the requirements and tests for lightning protection system components(LPSC)used for the installation of a lightning protection system(LPS)designed and implemented according to IEC 62305 series of standards.62561-1 IEC:2010 5 81/385/CDV LIGHTNING PROTECTION SYSTEM COMPONENTS(LPSC)Part 1:Requirements for connection components 1 Scope This Part 1 of IEC 62561 specifies the requirements and tests for metallic connection components that form part of a Lightning Protection System(LPS).Typically these can be connectors,bonding and bridging components,expansion pieces and test joints.Testing of components for explosive atmosphere is not covered by this standard 2 Normative references The following referenced documents are indispensable for the application of this document.For dated references,only the edition cited applies.For undated references,the latest edition of the referenced do