温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
IEC_81_226_INF
81/226/INFFor IEC use only2003-07-25INTERNATIONAL ELECTROTECHNICAL COMMISSIONTECHNICAL COMMITTEE No.81:LIGHTNING PROTECTIONTC 81/WG 9 Convenors report(to be discussed under draft agenda item 8 at the forthcoming TC 81 meeting to be held in Palma deMallorca 29th and 30th September 2003)As decided at the last meeting of TC 81 held in Florence,task of the WG 9 is to prepare a CD relevant toproject IEC 62305-2:Risk management for structures and services.A meeting has been done in Rome on December 2002 in which the comments received on 81/173/NP havebeen punctually considered and discussed,taking also into account the new task relevant to the servicesand the results of discussions during the Beijing meeting.Valuable contributions have been received from Mr.Landers and Mr.Kern(Germany),Mr.Flisowski(Poland),Mr.Rousseau(France),Mr.Darveniza(Australia),Mr.Kransteiner(Austria),Mr.Surtees and Mr.Guthrie(USA),and from the convenor of WG10,Mr.Zeddam,in order to agree the part of document relevantto the management of risk for protection of services entering the structure.During this meeting the way of calculation the fundamental parameters for risk assessment have beenextensively discussed.A task force(Mr.Kern,Mr.Flisowski,Mr.Surtees,Mr.Gillespie,Mr.Rousseau)was set up with the aim toprepare a simplified software for risk assessment.A new advanced draft(81/213/CD)has been prepared by the convenor and circulated by the end of Marchamong the National Committees.Deadline for comments was the 20th June 2003 and CC was immediatelycirculated among the WG9 members.A new meeting of WG 9 was held in Roma on 17th and 18th July 2003.In this meeting:comments to 81/213/CD were discussed;a first release of software prepared by the task force was exsamined.A complete document for CDV stage could be prepared according to the established TC 81 workprogramme._