分享
IEC_60364-7-706_64_1304_MCR.pdf
下载文档

ID:231793

大小:84.71KB

页数:1页

格式:PDF

时间:2023-03-14

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
IEC_60364 706 _64_1304_MCR
64/1304/MCRMAINTENANCE CYCLE REPORTIEC/TC or SCTC 64Date of circulation2003-06-13Title of the TC or SC concernedElectrical installations and protection aginst electric shockPublication number:IEC 60364-7-706,Ed.1Original publication date:1983-01Title of publication:Electrical installations of buildings Part 7:Requirements for special installations or locations Section706:Restrictive conductive locationsThe Maintenance Team makes the following recommendation for the above publication(check one of the alternatives)The publication is to be withdrawnReasons for the withdrawal:Date of withdrawal*:National Committees objecting to this decision should inform Central Office within two months.The publication is reconfirmed and the next review will take place in .The maintenance result date for the publication is .The publication is to be revised and will be included in the work programme with the following title:IEC 60364-7-706,Ed.2:Electrical installations of buildings Part 7-706:Requirements for specialinstallations or locations Restrictive conductive locations(Titre F):The publication is to be amended and will be included in the work programmeThe project is assigned to Maintenance Team:TC 64/WG 9Name,address and e-mail of project leaderMr.Paul CookInstitution of Electrical EngineersSavoy PlaceGB-LONDON WC2R 0BLUNITED KINGDOMTel:+44 171 344 54 02Fax:+44 171 497 21 43E-mail:pcookiee.org.ukProject plan:Proposed target datefor submission of aCD:2003-10CDV:2004-10FDIS:2005-07Date of publication as an IS:2005-12The date and place of the next MT meeting are:or arrangements for electronic operations are annexed.National Committees objecting to this recommendation should inform the TC/SC secretary,with copy to the Central Office,withintwo months,otherwise the recommendation will be considered as being approved.SecretariatName or signature of secretaryGermanyReinhard PELTAFORM MCR(IEC)2002-01-15

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开