温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
2023
计算机
相关
技术
外文
资料
翻译
模板
毕业设计(论文)外文资料翻译
系 别 计算机信息与技术系
专 业 计算机科学与技术
班 级 B070601
姓 名 魏博
学 号 B07060136
外文出处
附 件 1. 原文; 2. 译文
2023年3月
database development process
Based on information engineering information systems planning database is a source of development projects. These new database development projects is usually in order to meet the strategic needs of organizations, such as improving customer support, improve product and inventory management, or a more accurate sales forecast. However, many more database development project is the bottom-up approach emerging, such as information system user needs specific information to complete their work, thus beginning a project request, and as other information systems experts found that organizations need to improve data management and begin new projects. Bottom-up even in the circumstances, to set up an enterprise data model is also necessary to understand the existing database can provide the necessary data, otherwise, the new database, data entities and attributes can be added to the current data resources to the organization.
Both the strategic needs or operational information needs of each database development projects normally concentrated in a database. Some projects only concentrated in the database definition, design and implementation of a database, as a follow-up to the basis of the development of information systems. However, in most cases, the database and associated information processing function as a complete information systems development project was part of the development.
2.1 System Development Life Cycle
Guide management information system development projects is the traditional process of system development life cycle (SDLC). System development life cycle is an organization of the database designers and programmers information system composed of the Panel of Experts detailed description, development, maintenance and replacement of the entire information system steps. This process is because Waterfall than for every step into the adjacent the next step, that is, the information system is a specification developed by a piece of land, every piece of the output is under an input. However shown in the figure, these steps are not purely linear, each of the steps overlap in time (and thus can manage parallel steps), but when the need to reconsider previous decisions, but also to roll back some steps ahead. (And therefore water can be put back in the waterfall!)
The system development life cycle including each stage and database development-related activities, therefore, the question of database management systems throughout the entire development process. In Figure 5 we repeat of the system development life cycle stage of the seven, and outlines the common database at each stage of development activities. Please note that the systems development life cycle stages and database development steps exists between the relationship between the concept of modeling data in both systems development life cycle stages between.
1.Enterprise Modeling
Database development process from the enterprise modeling (system development life cycle stage of the project feasibility studies, and to choose a part)
Organizations set the scope and general database content. Enterprise modeling in information systems planning and other activities, these activities determine which part of information systems need to change and strengthen the entire organization and outlines the scope of data. In this step, check the current database and information systems, development of the project as the main areas of the nature of the business, with a very general description of each term in the development of information systems when needed data. Each item only when it achieved the expected goals of organizations can be when the next step.
2.Conceptual Data Modeling
One has already begun on the Information System project, the concept of data modeling phase of the information systems needs of all the data. It is divided into two stages. First, it began the project in the planning stage. At the same time outlining the establishment of other documents to the existing database without considering the circumstances specific development projects in the scope of the required data. This category only includes high-level data (entities), and main contact. Then in the system development life-cycle analysis stage must have a management information system set the entire organization Details of the data model definition of all data attributes, listing all data types that all data inter-entity business linkages, defining description of the full data integrity rules. In the analysis phase, but also the concept of inspection data model (also called the concept behind the model) and the goal of information systems used to explain other