分享
ASTM_C_1479_-_16.pdf
下载文档

ID:186522

大小:289.64KB

页数:9页

格式:PDF

时间:2023-03-04

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
TM_C_1479_ _16
Designation:C147916Standard Practice forInstallation of Precast Concrete Sewer,Storm Drain,andCulvert Pipe Using Standard Installations1This standard is issued under the fixed designation C1479;the number immediately following the designation indicates the year oforiginal adoption or,in the case of revision,the year of last revision.A number in parentheses indicates the year of last reapproval.Asuperscript epsilon()indicates an editorial change since the last revision or reapproval.1.Scope1.1 This practice covers the installation of precast concretepipe intended to be used for the conveyance of sewage,industrial wastes,and storm water and for the construction ofculverts.1.2 This practice is the inch-pound companion to PracticeC1479M;therefore,no SI equivalents are presented in thispractice.1.3 This standard does not purport to address all of thesafety concerns,if any,associated with its use.It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2.Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and RelatedProductsC1417 Specification for Manufacture of Reinforced Con-crete Sewer,Storm Drain,and Culvert Pipe for DirectDesignC1479M Practice for Installation of Precast Concrete Sewer,Storm Drain,and Culvert Pipe Using Standard Installa-tions(Metric)D698 Test Methods for Laboratory Compaction Character-istics of Soil Using Standard Effort(12,400 ft-lbf/ft3(600kN-m/m3)D1557 Test Methods for Laboratory Compaction Character-istics of Soil Using Modified Effort(56,000 ft-lbf/ft3(2,700 kN-m/m3)D2487 Practice for Classification of Soils for EngineeringPurposes(Unified Soil Classification System)D2488 Practice for Description and Identification of Soils(Visual-Manual Procedure)IEEE/ASTM SI 10 Standard for Use of the InternationalSystem of Units(SI):The Modern Metric System2.2 AASHTO Standards:3Standard Specifications for Highway BridgesM 145 Classification of Soils and SoilAggregate Mixturesfor Highway Construction PurposesT 99 The Moisture-Density Relations of Soils Using a 5.5 lb(2.5 kg)Rammer and a 12-in.(305 mm)DropT 180 The Moisture-Density Relations of Soils Using a 10 lb(4.54 kg)Rammer and an 18-in.(457 mm)DropT 310 In-Place Density and Moisture Content of Soil andSoilAggregate by Nuclear Methods(Shallow Depth)2.3 ASCE Standards:4ASCE 15 Standard Practice for the Direct Design of BuriedPrecast Reinforced Concrete Pipe Using Standard Instal-lations(SIDD)3.Terminology3.1 For definitions of terms relating to concrete pipe,seeTerminology C822.3.2 For terminology related to soil classifications,see Prac-tice D2487 and Practice D2488.3.3 For terminology and definitions of terms relating tostructural design,see ASCE 15.3.4 Fig.1 illustrates the definitions and limits of the terms:foundation,subgrade,bedding,outer bedding,middle bedding,haunch,lower side,backfill or overfill,invert,crown,springline,top of pipe,and bottom of pipe as used in thispractice.4.Significance and Use4.1 This practice is useful as a reference by an owner andthe owners engineer in preparing project specifications.1This practice is under the jurisdiction of ASTM Committee C13 on ConcretePipe and is the direct responsibility of Subcommittee C13.05 on Special Projects.Current edition approved Oct.15,2016.Published October 2016.Originallyapproved in 2000.Last previous edition approved in 2013 as C1479-13.DOI:10.1520/C1479-16.2For referenced ASTM standards,visit the ASTM website,www.astm.org,orcontact ASTM Customer Service at serviceastm.org.For Annual Book of ASTMStandards volume information,refer to the standards Document Summary page onthe ASTM website.3Available from American Association of State Highway and TransportationOfficials(AASHTO),444 N.Capitol St.,NW,Suite 249,Washington,DC 20001,http:/www.transportation.org.4Available from American Society of Civil Engineers(ASCE),1801 AlexanderBell Dr.,Reston,VA 20191,http:/www.asce.org.Copyright ASTM International,100 Barr Harbor Drive,PO Box C700,West Conshohocken,PA 19428-2959.United States1 5.NotationsDi=inside diameter of pipe,in.Do=outside diameter of pipe,in.H=design height of earth above top of pipe,ft.w=unit weight of soil,lb/ft3.6.Standard Installations6.1 The precast concrete pipe/soil system shall be con-structed to conform to the requirements of Figs.2 and 3 andTables 1 and 2 as designated on the plans.7.Excavation7.1 When rock or other unyielding foundation material isencountered,it shall be removed at least to the requirementsshown in Figs.2 and 3 and Tables 1 and 2.Overexcavatedareas shall be backfilled with approved materials and com-pacted to at least the standard proctor density specified for thebedding.7.2 Where surface water or groundwater conditions exist,the site and trench shall be dewatered.8.Foundation8.1 The foundation shall be moderately firm to hard in situsoil,stabilized soil,or compacted fill material.8.2 When unsuita

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开