分享
ASTM_C_1103_-_14.pdf
下载文档

ID:184537

大小:56.47KB

页数:2页

格式:PDF

时间:2023-03-04

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
TM_C_1103_ _14
Designation:C110314Standard Practice forJoint Acceptance Testing of Installed Precast Concrete PipeSewer Lines1This standard is issued under the fixed designation C1103;the number immediately following the designation indicates the year oforiginal adoption or,in the case of revision,the year of last revision.A number in parentheses indicates the year of last reapproval.Asuperscript epsilon()indicates an editorial change since the last revision or reapproval.1.Scope1.1 This practice covers procedures for testing the joints ofinstalled precast concrete pipe sewer lines,when using eitherair or water under low pressure to demonstrate the integrity ofthe joint and the construction procedures.This practice is usedfor testing 27-in.and larger diameter precast concrete sewerlines utilizing rubber gasket sealed joints.NOTE1The user of this practice is advised that methods describedherein may also be used as a preliminary test to enable the manufactureror installer to demonstrate the condition of sewer pipe prior to delivery.1.2 This practice is the inch-pound companion to PracticeC1103M;therefore,no SI equivalents are presented in thepractice.NOTE2The owner shall specify the following:who will conduct,observe,and furnish labor,material,and measuring devices and pay forthe tests;who is responsible for determining local ground conditions;andwhether an air or water test is to be used.NOTE3The user of this practice is advised that test criteria presentedin this practice are similar to those in general use.Pipe shall be acceptedby infiltration or exfiltration testing utilizing Practice C969.NOTE4Test times tabulated and the rate of air loss in this practice arebased on successful testing of installed pipelines.However,since air andwater have different physical properties,retests of some pipelines notmeeting field air tests have been successful when tested with water.1.3 This standard does not purport to address all of thesafety concerns,if any,associated with its use.It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.Specific precau-tions are given in Section 6.2.Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and RelatedProductsC969 Practice for Infiltration and Exfiltration AcceptanceTesting of Installed Precast Concrete Pipe Sewer Lines3.Terminology3.1 DefinitionsFor definitions of terms relating to concretepipe,see Terminology C822.4.Summary of Practice4.1 The joint in the sewer line to be tested is covered on theinside of the pipe by a ring with two end element sealing tubes.Air or water,at low pressure,is introduced through a connec-tion on the ring into the annular space between the ring andjoint.The amount of air,or water,loss is used to determine theacceptability of the installed sewer line.5.Significance and Use5.1 This is not a routine test.The values recorded areapplicable only to the sewer being tested and at the time oftesting.6.Safety Precautions6.1 The use of compressed air is dangerous if a sewer line isnot prepared properly and proper procedures are not followed.6.2 It is imperative that all pressures be relieved completelybefore the test apparatus is loosened for removal.6.3 Pressurizing lines for the two end element sealing tubesshall be separate from the lines for pressurizing the voidvolume created by the joint test apparatus.The pressuresrequired to seal the end element tubes shall be as specified bythe apparatus manufacturer,and are greater than the pressurerequired to test the joint.The line for pressurizing the voidvolume shall include a 6-psi pressure relief device to reducehazards and avoid overpressurization.7.Preparation of the Sewer Joint7.1 Check the size of access openings to ensure that the testapparatus will fit in the sewer line.7.2 Clean the joint and interior joint surfaces to eliminatedebris prior to wetting and testing.NOTE5The user of this practice is advised that a wetted interiorsurface is desirable and will produce more consistent results.Air may passthrough the walls of dry pipe.This can be overcome by wetting the pipe.1This practice is under the jurisdiction of ASTM Committee C13 on ConcretePipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved Nov.15,2014.Published November 2014.Originallyapproved in 1989.Last previous edition approved in 2009 as C1103 03(2009).DOI:10.1520/C1103-14.2For referenced ASTM standards,visit the ASTM website,www.astm.org,orcontact ASTM Customer Service at serviceastm.org.For Annual Book of ASTMStandards volume information,refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International,100 Barr Harbor Drive,PO Box C700,West Conshohocken,PA 19428-2959.United States1 7.3 Review safety precautions in Section 6.8.Procedures8.1 The following procedures apply to testing with either airor water.8.1.1 Determine groundwa

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开