分享
ASTM_D_6089_-_15.pdf
下载文档

ID:175054

大小:62.63KB

页数:3页

格式:PDF

时间:2023-03-04

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
TM_D_6089_ _15
Designation:D608915Standard Guide forDocumenting a Groundwater Sampling Event1This standard is issued under the fixed designation D6089;the number immediately following the designation indicates the year oforiginal adoption or,in the case of revision,the year of last revision.A number in parentheses indicates the year of last reapproval.Asuperscript epsilon()indicates an editorial change since the last revision or reapproval.1.Scope*1.1 This guide covers what and how information should berecorded in the field when sampling a groundwater monitoringwell.Following these recommendations will provide adequatedocumentation in most monitoring programs.In somesituations,it may be necessary to record additional or differentinformation,or both,to thoroughly document the samplingevent.In other cases,it may not be necessary to record all ofthe information recommended in this guide.The level ofdocumentation will be based on site-specific conditions andregulatory requirements.1.2 This guide is limited to written documentation of agroundwater sampling event.Other methods of documentation(that is,electronic and audiovisual)can be used but are notaddressed in this guide.The specific activities addressed in thisguideincludedocumentationofstaticwaterlevelmeasurement,monitoring well purging,monitoring wellsampling,fieldmeasurements,groundwatersamplepreparation,and groundwater sample shipment.1.3 This standard does not purport to address all of thesafety concerns,if any,associated with its use.It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.1.4 This guide offers an organized collection of informationor a series of options and does not recommend a specificcourse of action.This document cannot replace education orexperience and should be used in conjunction with professionaljudgment.Not all aspects of this guide may be applicable in allcircumstances.This ASTM standard is not intended to repre-sent or replace the standard of care by which the adequacy ofa given professional service must be judged,nor should thisdocument be applied without consideration of a projects manyunique aspects.The word“Standard”in the title of thisdocument means only that the document has been approvedthrough the ASTM consensus process.2.Referenced Documents2.1 ASTM Standards:2D5088 Practice for Decontamination of Field EquipmentUsed at Waste SitesD5608 Practices for Decontamination of Field EquipmentUsed at Low Level Radioactive Waste SitesD5903 Guide for Planning and Preparing for a GroundwaterSampling Event3.Terminology3.1 DefinitionsFor definitions of terms used in this guide,refer to Terminology D653.3.2 Definitions of Terms Specific to This Standard:3.2.1 chain of custodythe process of maintaining account-ability of the samples for the purpose of identifying potentialbreaches in sample integrity.3.2.2 chain of custody recorda record of all individualswho possess the samples from the time of collection untilanalysis.4.Significance and Use4.1 When sampling groundwater monitoring wells,it is veryimportant to thoroughly document all field activities.Sufficientfield data should be retained to allow one to reconstruct theprocedures and conditions that may have affected the integrityof a sample.The field data generated are vital to the interpre-tation of the chemical data obtained from laboratory analysesof samples.Field data and observations may also be useful toanalytical laboratory personnel.4.2 Due to the changing nature of regulations and otherinformation,users are advised to thoroughly research require-ments related to packaging and shipping prior to initiating asampling event.NOTE1The sampling of an individual groundwater monitoring wellshould be repeated as closely as possible each time the monitoring well issampled.This reduces the variability of the chemical parameters due tosampling variability which is the desired result.The intent is to detect thechange in chemistry by repeating the sampling protocol at each individual1This guide is under the jurisdiction ofASTM Committee D18 on Soil and Rockand is the direct responsibility of Subcommittee D18.21 on Groundwater andVadose Zone Investigations.Current edition approved March 1,2015.Published March 2015.Originallyapproved in 1997.Last previous edition approved in 2010 as D6089 97(2010).DOI:10.1520/D6089-15.2For referenced ASTM standards,visit the ASTM website,www.astm.org,orcontact ASTM Customer Service at serviceastm.org.For Annual Book of ASTMStandards volume information,refer to the standards Document Summary page onthe ASTM website.*A Summary of Changes section appears at the end of this standardCopyright ASTM International,100 Barr Harbor Drive,PO Box C700,West Conshohocken,PA 19428-2959.United States1 well.This does not mean that all the wells are sampled the same way,nordoes it prohibit changes in the sampling protocol,provided they areplanned and documented.5.Doc

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开