分享
ASTM_D_6087_-_08_2015e1.pdf
下载文档

ID:174730

大小:122.43KB

页数:6页

格式:PDF

时间:2023-03-04

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
TM_D_6087_ _08_2015e1
Designation:D608708(Reapproved 2015)1Standard Test Method forEvaluating Asphalt-Covered Concrete Bridge Decks UsingGround Penetrating Radar1This standard is issued under the fixed designation D6087;the number immediately following the designation indicates the year oforiginal adoption or,in the case of revision,the year of last revision.A number in parentheses indicates the year of last reapproval.Asuperscript epsilon()indicates an editorial change since the last revision or reapproval.1NOTERemoved converted inch-pound units editorially in June 2015.1.Scope1.1 This test method covers several ground penetratingradar(GPR)evaluation procedures that can be used to evaluatethe condition of concrete bridge decks overlaid with asphalticconcrete wearing surfaces.These procedures can also be usedfor bridge decks overlaid with portland cement concrete andfor bridge decks without an overlay.Specifically,this testmethod predicts the presence or absence of concrete or rebardeterioration at or above the level of the top layer of reinforc-ing bar.1.2 Deterioration in concrete bridge decks is manifested bythe corrosion of embedded reinforcement or the decompositionof concrete,or both.The most serious form of deterioration isthat which is caused by corrosion of embedded reinforcement.Corrosion may be initiated by deicing salts,used for snow andice control in the winter months,penetrating the concrete.Inarid climates,the corrosion can be initiated by chloride ionscontained in the mix ingredients.Deterioration may also beinitiated by the intrusion of water and aggravated by subse-quent freeze/thaw cycles causing damage to the concrete andsubsequent debonding of the reinforcing steel with the sur-rounding compromised concrete.1.2.1 As the reinforcing steel corrodes,it expands andcreates a crack or subsurface fracture plane in the concrete ator just above the level of the reinforcement.The fracture plane,or delamination,may be localized or may extend over asubstantial area,especially if the concrete cover to the rein-forcement is small.It is not uncommon for more than onedelamination to occur on different planes between the concretesurface and the reinforcing steel.Delaminations are not visibleon the concrete surface.However,if repairs are not made,thedelaminations progress to open spalls and,with continuedcorrosion,eventually affect the structural integrity of the deck.1.2.2 The portion of concrete contaminated with excessivechlorides is generally structurally deficient compared withnon-contaminated concrete.Additionally,the chloride-contaminated concrete provides a pathway for the chloride ionsto initiate corrosion of the reinforcing steel.It is therefore ofparticular interest in bridge deck condition investigations tolocate not only the areas of active reinforcement corrosion,butalso areas of chloride-contaminated and otherwise deterioratedconcrete.1.3 This test method may not be suitable for evaluatingbridges with delaminations that are localized over the diameterof the reinforcement,or for those bridges that have cathodicprotection(coke breeze as cathode)installed on the bridge orfor which a conductive aggregate has been used in the asphalt(that is,blast furnace slag).This is because metals are perfectreflectors of electromagnetic waves,since the wave imped-ances for metals are zero.1.4 A precision and bias statement has not been developedat this time.Therefore,this standard should not be used foracceptance or rejection of a material for purchasing purposes.1.5 The values stated in SI units are to be regarded asstandard.No other units of measurement are included in thisstandard.1.6 This standard does not purport to address all of thesafety concerns,if any,associated with its use.It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.Specific precau-tionary statements are given in Section 5.2.Summary of Test Method2.1 The data collection equipment consists of a short-pulseGPR device,data acquisition device,recording device,anddata processing and interpretation equipment.The user makesrepeated passes with the data collection equipment in adirection parallel or perpendicular to the centerline across abridge deck at specified locations.Bridge deck condition isquantified based on the data obtained.1This test method is under the jurisdiction of ASTM Committee D04 on Roadand Paving Materials and is the direct responsibility of Subcommittee D04.32 onBridges and Structures.Current edition approved June 1,2015.Published July 2015.Originally approvedin 1997.Last previous edition approved in 2008 as D6087 08.DOI:10.1520/D6087-08R15E01.Copyright ASTM International,100 Barr Harbor Drive,PO Box C700,West Conshohocken,PA 19428-2959.United States1 3.Significance and Use3.1 This test method provides information on the conditionof concrete bridge decks overlaid with asphaltic concretewithout necessitating removal of the

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开