分享
ASTM_D_6235_-_18.pdf
下载文档

ID:174427

大小:2.54MB

页数:50页

格式:PDF

时间:2023-03-04

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
TM_D_6235_ _18
Designation:D623518Standard Practice forExpedited Site Characterization of Vadose Zone andGroundwater Contamination at Hazardous WasteContaminated Sites1This standard is issued under the fixed designation D6235;the number immediately following the designation indicates the year oforiginal adoption or,in the case of revision,the year of last revision.A number in parentheses indicates the year of last reapproval.Asuperscript epsilon()indicates an editorial change since the last revision or reapproval.1.Scope1.1 Applicability of the ESC ProcessThis practice coversa process for expedited site characterization(ESC)of hazard-ous waste contaminated sites2to identify vadose zone,ground-water and other relevant contaminant migration pathways anddetermine the distribution,concentration,and fate of contami-nants for the purpose of providing an ESC client,regulatoryauthority,and stakeholders with the necessary information tochoose a course of action.3Generally,the process is applicableto larger-scale projects or contaminated sites where the ESCprocess can be reasonably expected to reduce the time and costof site characterization compared to alternative approaches.The ESC process has been applied successfully at a variety ofsites(see Table X1.1).It typically achieves significant cost andschedule savings compared to traditional site characterization(see X1.2 and X1.3),4although it should be recognized thatin-depth site characterization of hazardous waste contaminatedsites may require a more elaborate process than ESC.1.2 Features of the ESC ProcessThe ESC process oper-ates within the framework of existing regulatory programs.Itfocuses on collecting only the information required to meetcharacterization objectives and on ensuring that characteriza-tion ceases as soon as the objectives are met.Central to theESC process is the use of judgement-based sampling andmeasurement to characterize vadose zone and groundwatercontamination in a limited number of field mobilizations by anintegrated multidisciplinary team,led by a technical leader andoperating within the framework of a dynamic work plan thatgives him or her the flexibility of responsibility to select thetype and location of measurements needed to optimize datacollection activities.Table 1 identifies other essential featuresof the ESC process,and Fig.1 presents a flow diagram for theentire ESC process.1.3 Investigation MethodsThe process described in thispractice is based on good scientific practice but is not tied toany particular regulatory program,site investigation method ortechnique,chemical analysis method,statistical analysismethod,risk analysis method,or computer modeling code.Appropriate investigation techniques in an ESC project arehighly site specific and are selected and modified based uponthe professional judgement of the core technical team(inparticular the technical team leader).Whenever feasible,non-invasive and minimally invasive methods are used,as dis-cussed in Appendix X2.Appropriate chemical analysis meth-ods are equally site specific.Analyses may be conducted in thefield or laboratory,depending on data quality requirements,required turnaround time,and costs.1.4 Sites Generally Not Appropriate for the ESC ProcessGenerally,the ESC process is not applicable to:small petro-leum release sites,real estate property transactions that requireno more than a Phase I ESA,sites where contamination islimited to the near surface or there is no basis for suspectingthat contaminant movement through the vadose zone andgroundwater is a matter of concern,sites where the cost ofremedial action is likely to be less than the cost of sitecharacterization,or sites where existing statutes or regulationsprohibit the use of essential features of the ESC process.51.5 Other Potentially Applicable ASTM Standards for SiteCharacterizationGuide E1912 addresses accelerated site1This practice is under the jurisdiction of ASTM Committee D18 on Soil andRock and is the direct responsibility of Subcommittee D18.01 on Surface andSubsurface Characterization.Current edition approved Dec.15,2018.Published January 2019.Originallyapproved in 1998.Last previous edition approved in 2010 as D6235 04(2010).DOI:10.1520/D6235-18.2The term hazardous waste in the title is used descriptively.The term also hasspecific meanings in the context of different regulatory programs.Expedited sitecharacterization is also appropriate for radiologically contaminated sites and somelarger petroleum release sites,such as refineries.Section 4.2 further identifies typesof contaminated sites where ESC may be appropriate.See Appendix X1 foradditional background on the ESC process.3The text of this practice emphasizes vadose zone and groundwater contamina-tion because these contaminant migration pathways are the most difficult tocharacterize.An ESC project should also address all other relevant contaminantmigration pathways,such as air,surface water,submerged sediments,and biota.4This practice uses the term“traditional”site

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开