分享
E_B1_technical_report_1983.pdf
下载文档

ID:167498

大小:413.82KB

页数:11页

格式:PDF

时间:2023-03-03

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
E_B1_technical_report_1983
ASME B1*TECH*REPT930759b700532181380ASME B1 TECHNICAL REPORTMeasurement Uncertaintyfor 60 deg.Screw ThreadGage Element Measurement(Inch and Metric)习】The American Society ofMechanical Engineers345 East 47th Street,New York,N.Y.10017ASME B1*TECH*REPT930759b700532183T53FOREWORD(This Foreword is not part of the B1 Technical Report.)Every measurement has a degree of uncertainty.This problem surfaces when screw threadshad to assemble and be interchangable.Early standards writers provided safeguards by estab-lishing a common basic size where the products limits were not permitted to cross.All formsvariations which result in a functional size had to meet this requirement.As time progressed screw thread writers simplified the concept by placing Class 3 maxi-mum-material pitch diameter of both product and gage for internal and external threads atbasic,assuming both gage and product have no form variations.By doing this,it became difficultto manufacture gages with close tolerances to gage marginal product with certainty.This Report does not solve the screw thread standards concept.It recognizes that gages shallbe made to specified tolerances by the gagemaker,but may be outside the tolerance by a secondpartys uncertainty.At the October 1987 meeting of the ASME BI Committee in New York City,a workinggroup was created to address uncertainty.After several meetings,a scope and tentative measurement uncertainty values were proposed at the April 1989 meeting in Orlando,Florida.This Report represents the best estimates for measurement uncertainty for gage sizes through12 inches(300 millimeters).A gage is acceptable when a second partys measurement exceedsthe tolerance by the tabulated value.The uncertainty value may be changed at a future date if statistical data justify such a change.Suggestions for the improvement of this Report will be welcome.They should be sent toSecretary,ASME B1 Main Committee,345 East 47th Street,New York,NY 10017.This Technical Report was approved by the ASME Board on Standardization on October 19,1992.心

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开