分享
_RP_550-1-8-1980_scan.pdf
下载文档

ID:166581

大小:1.35MB

页数:20页

格式:PDF

时间:2023-03-03

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
_RP_550 1980 _scan
API RECOMMENDED PRACTICE 550FOURTH EDITION,OCTOBER 1980Manual on Installation of RefineryInstruments and Control SystemsPart I-Process Instrumentation and ControlSection 8-Seals,Purges,and Winterizing621-7G62.8AME3242Manual on Installation of RefineryInstruments and Control SystemsPart I-Process Instrumentation and ControlSection 8-Seals,Purges,and WinterizingAPI RECOMMENDED PRACTICE 550FOURTH EDITION,OCTOBER 1980春oNERLIBRARY分食292RECEIVED(l hdat a,American Petroleum Institute2101 L Street,NorthwestWashington,D.C.20037Manual on Installation of RefineryInstruments and Control SystemsPart I-Process Instrumentation and ControlSection 8-Seals,Purges,and WinterizingRefining DepartmentAPI RECOMMENDED PRACTICE 550FOURTH EDITION,OCTOBER 1980OFFICIAL PUBLICATIONREG US PATENT OFFICEFOREWORDThis recommended practice is based on the accumulated knowledge and experience ofengineers in the petroleum industry.Its purpose is to aid in the installation of the moregenerally used measuring,control,and analytical instruments;transmission systems;andrelated accessories to achieve safe,continuous,accurate,and efficient operation withminimum maintenance.Although the information has been prepared primarily forpetroleum refineries,much of it is applicable without change in chemical plants,gasolineplants,and similar installations.Successful instrumentation depends upon a workable arrangement that incorporates thesimplest systems and devices that will satisfy specified requirements.Sufficientschedules,drawings,sketches,and other data should be provided to enable the constructorto install the equipment in the desired manner.The various industry codes and standardsand laws and rulings of regulating bodies should be followed where applicable.For maximum plant personnel safety,transmission systems are employed to eliminatethe piping of hydrocarbons.acids,and other hazardous or noxious materials toinstruments in control rooms.Proper installation is essential in order to use fully thecapabilities that are built into the instrument or transmission system.In the installation of an instrument,the various components must be accessible forefficient maintenance,and certain of these elements must be readable for good operationOrifices,control valves,transmitters,thermocouples,level gages,and local controllers,as well as analyzer sample points.generally should be readily accessible from grade,permanent platforms,or fixed ladders.In this manual,special consideration is given to thelocation,accessibility,and readability of the elements.Users of this manual are reminded that in the rapidly advancing field of instrumentationno publication of this type can be complete nor can any written document be substitutedfor qualified engineering analysisCertain systems are not covered in this section because of their highly specialized natureand limited use.When one of these systems gains general usage and installation reaches afair degree of standardization,this section will be revised to incorporate such additionalinformation.Acknowledgment is made to all the engineers and operating and maintenance personnelwho,through years of study,observation,invention,and sometimes trial and error,havecontributed to the technology of instrumentationSuggested revisions are invited and should be submitted to the director of the RefiningDepartment,American Petroleum Institute,2101 L Street,N.W.,Washington,D.C.20037.

此文档下载收益归作者所有

下载文档
猜你喜欢
你可能关注的文档
收起
展开