分享
_RP_550-1-3-1976_scan.pdf
下载文档

ID:166527

大小:1.07MB

页数:19页

格式:PDF

时间:2023-03-03

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
_RP_550 1976 _scan
API RECOMMENDED PRACTICE 550THIRD EDITION,197625Manual on Installation of RefineryInstruments and Control SystemsPart 1-Process Instrumentation and ControlSection 3-Temperature0.5219.323:5365AMePLEASE BETCM.E.P.L.ENGiNEEManual on Installation of RefineryInstruments and Control SystemsPart I-Process Instrumentation and ControlSection 3-TemperatureAPI RECOMMENDED PRACTICE 550THIRD EDITION,1976PLEASE RETURN TO:-M.E.P.L.ENGINEERiNG LSllp heak asAmerican Petroleum Institute2101 L Street.Northwestd4Washington.D C 20037FOREWORDThis recommended practice is based on the accumulated knowledge and experi-ence of engineers in the petroleum industry.Its purpose is to aid in the installationof the more generally used measuring,control,and analytical instruments;trans-mission systems;and related accessories in order to achieve safe,continuous,accu-rate,and efficient operation with minimum maintenance Although the informa-tion contained herein has been prepared primarily for petroleum refineries,muchof it is applicable without change in chemical plants,gasoline plants,and similarinstallations.Successful instrumentation depends upon a workable arrangement that incorpo-rates the simplest system and devices that will satisfy specified requirements.Suffi-cient schedules,drawings,sketches,and other data should be provided to enablethe constructor to install the equipment in the desired manner The various indus-try codes and standards.and laws and rulings of regulating bodies should be fol-lowed where applicable.The information contained in this publication does notconstitute,and should not be construed to be,a code of rules or regulations.Furthermore,it does not grant the right,by implication or otherwise.for manu-facture,sale.or use in connection with any method.apparatus.or product coveredby letters patent;nor does it ensure anyone against liability for infringement ofletters patentFor maximum plant personnel safety,transmission systems are employed toeliminate the piping of hydrocarbons,acids.and other hazardous or noxious ma-terials to instruments in control rooms Proper installation is essential in order toutilize the full capabilities which are built into the instrument or transmission systemIn the installation of an instrument,the various components must be accessiblefor efficient maintenance and certain of these elements must be readable for goodoperation Orifices,control valves.transmitters,thermocouples,level gages,andlocal controllers,as well as analyzer sample points,generally should be readilyaccessible from grade,permanent platforms,or fixed ladders.In this manual,special consideration is given to the location.accessibility,and readability of theelements.Users of the various sections of this manual are reminded that in the rapidlyadvancing field of instrumentation no publication of this type can be complete,norcan any written document be substituted for qualified engineering analysisCertain systems are not covered herein because of their very specialized natureand limited use.When one of these systems gains general usage and installationreaches a fair degree of standardization,this section will be revised to incorporatesuch additional informationAcknowledgment is made of the work of all the engineers and operating andmaintenance personnel who,through years of study,observation,invention,andsometimes trial and error.have contributed to the technology of instrumentation.Suggested revisions are invited and should be submitted to the Director of theRefining Department.American Petroleum Institute.2101 L Street.N W.Wash-ington,D.C 20037)斑

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开