分享
_IP_Spec_1584-2001_scan.pdf
下载文档

ID:166454

大小:1.86MB

页数:49页

格式:PDF

时间:2023-03-03

收藏 分享赚钱
温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
_IP_Spec_1584 2001 _scan
FOUR-INCH HYDRANT SYSTEMCOMPONENTS AND ARRANGEMENTSAPL/IP SPECIFICATION 1584Third editionApril 2001PAmericanPetroleumInstituteTHE INSTITUTEOF PETROLEUM解ep器gowGet新e6Done Right.Copyright 2001 by American Petroleum Institute,andThe Institute of Petroleum,London:A charitable company limited by guarantee.Registered No.135273,EnglandAll rights reservedNo part of this book may be reproduced by any means,or transmitted or translated intoa machine language without the written permission of the publisher.ISBN0852932804Published by The Institute of PetroleumFurther copies can be obtained from Portland Press Ltd.Commerce Way,Whitehall Industrial Estate,Colchester CO2 8HP,UK.Tel:44(0)1206 796 351emall:sales(CONTENTSPagef0rw0rd。,。,。,ViiAcknowledgements.,。ix1 Introduction,scope and referenced publications11.1Introduction.1.2Scope11.3Referenced publications.22 Terms,definitions and abbreviations.32.1Terms anddefinitions.32.2Abbreviations52.3Units used53 General arrangements and features.73.1Typical arrangement of hydrant pit equipment and controls.73.2Mandatory requirements73.30 ptional items.194 Performance criteria and testing procedures.214.1Mechanical strength.,.,.,.,4.2Test fluid。,。,214.3Dimensional checks4.4Proof and burst pressure4.5Pressure loss.,。224.6Opening and closing times and overshoot.224.7Vacuum test.234.8Pilot device override test.234.9External load resistance and failure mode.234.10 Catastrophic excess flow254.11Decoupling spillage.264.12 Pressure,surge and flow control.265 Type approval testing and quality assurance.275.1Qualityassurance.5.2Approval testing35.3Documentation and instruction27

此文档下载收益归作者所有

下载文档
你可能关注的文档
收起
展开