温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
_API_PUBL_700
Checklist for Plant CompletionSECTION 1-PURPOSEThis checklist is intended to assist the Contractor and Owner in defining their separateresponsibilities in the execution of work assignments as the plant or various areas.sys-tems,and facilities of the plant are being completed.It is also intended to facilitate thetransfer of responsibility from the Contractor to the Owner for the care.custody.andcontrol of the plant.in order to satisfy the requirements of each Contractor-Owner relationship.it may benecessary for the parties to make some revisions to the checklist.Negotiations betweenthe Contractor and Owner shall establish the desired division of responsibility.SECTION 2-DEFINITIONSSection 2 presents definitions which along with the general and specific proceduresgiven in Sections 3 and 4 serve to clarify the basic principles associated with the transferof responsibility from the Contractor to the Owner at commissioning time.(a)Precommissioning.Precommissioning activities are the nonoperating adjustmentsand cold alignment checks detailed in Sections 3 and 4 that are generally made by theContractor.(b)Ready for commissioning.The plant.or part thereof.isready for commissioningwhen the plant.or any part thereof.has been erected in accordance with drawings.spec-ifications.instructions.and applicable codes and regulations to the extent necessary topermit commissioning and when the precommissioning activities detailed in Sections 3and 4 have been completed.(c)Commissioning.The commissioning period follows the completion of the precom-missioning activities performed by the Contractor.Commissioning activities are associ-ated with the operation of items of equipment or facilities in preparation for plant startupand may continue through the initial operation of the plant.These activities are theOwners responsibilities unless the contract specifically provides otherwise.(d)Completion of construction.Completion of construction means that the Contractorhas:1.Erected the plant.2.Completed precommissioning work3.Completed all special commissioning activities.4.Completed final cleanup.painting.and insulation work.SECTION 3-GENERAL PROCEDURESThe general procedures listed in Section 3 outline the work to be performed by theContractor and by the Owner.Procedures applicable to specific systems or items ofequipment are covered separately in Section 4.In order to define more clearly the specific responsibilities for cach work requirement.the checklist can beused with a code of activities to detail specific assignments.The following code is typical:X Perform work W Witness workR Review work 1 Inspect wurk1