温馨提示:
1. 部分包含数学公式或PPT动画的文件,查看预览时可能会显示错乱或异常,文件下载后无此问题,请放心下载。
2. 本文档由用户上传,版权归属用户,汇文网负责整理代发布。如果您对本文档版权有争议请及时联系客服。
3. 下载前请仔细阅读文档内容,确认文档内容符合您的需求后进行下载,若出现内容与标题不符可向本站投诉处理。
4. 下载文档时可能由于网络波动等原因无法下载或下载错误,付费完成后未能成功下载的用户请联系客服处理。
网站客服:3074922707
_API_MPMS_2
B_1995_2005
Manual of PetroleumMeasurement StandardsChapter 2-Tank CalibrationSection 8B-Recommended Practice forThe Establishment of theLocation of the ReferenceGauge Point and the GaugeHeight of Tanks on MarineTank VesselsMeasurement CoordinationFIRST EDITION,AUGUST 1995AmericanPetroleumInstitutePNo roproduction or notworking permitled without liconso from IHSNot for RosaleFOREWORDThe API Manual of Petroleum Measurement Standards(MPMS)is currently available.The manual will eventually include all subject matter now found in API measurementpublications-including evaporation loss measurement-as well as new material andrevised editions of existing MPMS material when revisions are completed.API publications may be used by anyone desiring to do so.Every effort has been madeby the Institute to assure the accuracy and reliability of the data contained in them;however,the Institute makes no representation,warranty,or guarantee in connection with this publi-cation and hereby expressly disclaims any liability or responsibility for loss or damageresulting from its use or for the violation of any federal,state,or municipal regulation withwhich this publication may conflict.Suggested revisions are invited and should be submitted to Measurement Coordination,Exploration and Production Department,American Petroleum Institute,1220 L Street,N.W.,Washington,D.C.20005.d by IHS undoNo roproduction or notworking permitled without liconso from IHSNot for Rosale